Ports
Dock Unloading/Loading Gantry Cranes: Model SU120 System with two lubrication collars used. Servicing 1-1/4″ (32mm) Load Lines. Lubricant: Dynagard Blue. Location: Port Everglades, Florida.
Caltrans Long Beach Harbor Heim Bridge
(1-1/2″ Lift Bridge Cable)
California Dept Of Transportation Lift Bridge Cables. Installed in 1948. Cost to replace: Over 1 million USD. System SU120. Lubricant: Dynagard Blue. Ropes still coated